Operations / user manual
Activity
Shows human-readable audit history. Displays recorded control-plane activity.
Observe the control plane, understand changes, and coordinate safe work.
Control-plane observation flow
Forge control plane
How to use it
Operator workflow
- 01
Open Activity from the administrator panel and review the current state.
- 02
Set the specific configuration that expresses the desired activity outcome.
- 03
Save deliberately, then follow the operation, activity, health, or runtime observation that confirms the result.
- 04
Keep the before-and-after evidence in Activity and verify the workload path before relying on the change.
What Forge owns
Boundary and safety
Operations reads durable state and node observations. It does not give a node independent authority to schedule work.
Review the affected node, workload, route, or secret before saving. Capture state and health evidence before changes that affect data or public traffic.
Before you finish
Verification checklist
- The operator has the required administrative role.
- The intended node, workload, or project is selected.
- The resulting operation or observation reaches a terminal state.
- A rollback path exists before changing production traffic or storage.
Continue the manual
Use this feature in the wider Forge workflow.
Move from platform understanding to the relevant operating guide when you need exact environment, network, deployment, or recovery steps.